Benefits of Using Smart Whiteboard Paint - White
Unleash Creativity & Boost Collaboration
Apply our Whiteboard Paint to any smooth surface to empower your team to ideate, strategize, and visualize ideas in real-time.
Maximize Efficiency & Cost-Effectiveness
Smart Whiteboard Paint offers a cost-effective alternative to traditional whiteboards. No more investing in multiple boards or large-scale installations.
Tailor-Made Whiteboard Paint Solutions for Every Space
Our whiteboard paint seamlessly integrates into any décor or design scheme. Once applied, it provides a smooth, joint free, clean and erasable surface that blends with your workspace.
Collaborative Learning and Idea Sharing
A large whiteboard surface encourages collaboration and group brainstorming sessions, facilitating better idea sharing and problem-solving in the workplace and in education.
Sustainability and Longevity
Contribute to a greener future and eliminate the need for disposable paper and reduce waste. Our whiteboard paint withstands regular use, erasing without ghosting or staining, delivering a sustainable and long-lasting investment.
Smart Whiteboard Paint - White - Technical Specifications
Coverage / Volume / Weight / VOC:
- 2m² / 147ml / 195g / 12g
- 6m² / 426 ml / 565g / 12g
- 18m² / 1278ml / 1,695g / 36g
Product Color: White (RAL 9003)
Finish: Gloss
Gloss Measurement: 98 GU at 60 degrees
Odor: Very low
VOC: Less than 0.13%
Certification for Fire, LEED, M1, VOC & IAC
Suitable Surfaces: walls, desks, furniture, glass, partitions, or any smooth surface
Manufactured with over a decade of proven whiteboard surface technology
Primer: A water based primer must be used before applying Smart Whiteboard Paint White to any surface
Unsure about the right product for you? We offer video call support, live chat, phone and email. Avail of free technical advice and suggestions for ideas and product recommendations so you can choose what will work best for you. Unsure about installation? We are here to help and advise you.
Kit Contents
- Smart Whiteboard Paint – Part A
- Smart Whiteboard Paint – Part B
- Microfibre cloth
- Roller Handle
- Roller Sleeve
- Sanding Block
- Stirring Stick
- Pair of gloves
- Surface Sticker
- Application Guide
Smart Whiteboard Paint - White Reviews



Explore More Products From Smarter Surfaces
- (0 Reviews)
Matt Whiteboard Paint
From SGD$400.00 Select options This product has multiple variants. The options may be chosen on the product page - (0 Reviews)
Antimicrobial Whiteboard Paint
From SGD$420.00 Select options This product has multiple variants. The options may be chosen on the product page
FAQ's
A good smooth surface like a smooth plaster or gypsum wall is best for whiteboard paint. If the surface is poor you will need to prepare the surface first by filling and sanding. If you will use your whiteboard paint in a school or public space like an office check it has fire certification. Smart Whiteboard Paint is fire certified.
For refurbishing old whiteboards or chalkboards consider our Self Adhesive Whiteboard Films for fast installation.
- Step 1 Preparation - fill the surface where needed with decorators filler then sand the surface smooth and remove any sanding dust. Apply two coats of Smart White Primer. Allow this to dry overnight before the whiteboard paint is applied.
- Step 2 Coverage - Ensure you have enough whiteboard paint to cover the area as stretching the paint will affect the whiteboard performance.
- Step 3 Mix and apply - Mix part A and B of the paint together and stir well. Then with a new lint free roller or foam roller apply a genorous smooth coating by rolling over the surface multiple times with the roller to ensure the paint has covered well and there are no missed spots. After a section stop and inspect visually to ensure no missed spots.
- Step 4 Write and Draw and take your collaboration to the next level using any normal whiteboard marker. Our award-winning Smart Whiteboard Paint comes with a ten-year performance guarantee.
Smart Whiteboard Paint Clear can be applied over any color, except for white as it may tinge the wall. For best results use Smart Whiteboard Paint White over a white surface.
Smart Whiteboard Paint - White Installation
Our Smart Whiteboard Paint – White does not require professional installation. Anyone can apply this dry erase paint.
It is important that your surface is smooth before application. A smooth surface will help you achieve the best final results. A water based primer must be used before applying Smart Whiteboard Paint to any surface. We recommend using our Smart White Primer as it has been tested to work with our whiteboard paint.
Simply apply the primer, allow it to dry, then apply one coat of our whiteboard paint.
Once the whiteboard paint has been applied, wait 4 days before using the dry erase surface.
A full application guide to help you apply our whiteboard paint.
Whiteboard Paint Installation Video
Watch our step-by-step Video Application Guide
Whiteboard Paint White Videos
Improve Sales Management Techniques Today | Magnetic Whiteboard Walls
Expand Your Creativity Like This Animation Giant | Learn from The Pros
Modern Solutions Meeting Modern Demands | Whiteboard Paint | Smarter Surfaces
















